Gateway City has developed 115 KV high-voltage transmission lines with dual circuit system from the Bangpakong Power Plant and Prachinburi Power Plant and built a on site power substation at Gateway City with a current load capacity of 150 MVA, which will be further increased to 250 MVA. Customers receive an average electricity supply of 40 KVA per rai.