| No |
Utilities / Services |
Charge Rates |
| 1 |
Water Supply Utilization
| - |
Raw water reservoir of 7,500,000 cu.m |
| - |
Water treatment plant (solid contact with automatic back washing filter and disinfection system |
| - |
Clear wells, underground tanks, elevated tanks |
| - |
Distribution pipeline to each factory |
| - |
Water quality conforms to WHO's drinking water standard | |
13.00 Baht / cu.m |
| 2 |
Wastewater Discharge
| - |
Sanitary sewer to every plot of land |
| - |
Wastewater pumping station |
| - |
Central wastewater treatment plant (Activated sludge process ) | |
| BOD ( Mg / L ) |
Rates (per cu.m wastewater) |
| 0 - 51 |
4.90 Baht / cu.m. |
| 51 - 100 |
5.31 Baht / cu.m. |
| 101 - 200 |
6.12 Baht / cu.m |
| 201 - 300 |
6.93 Baht / cu.m |
| 301 - 400 |
7.74 Baht / cu.m |
| 401 - 500 |
8.55 Baht / cu.m |
| over 500 |
requires pretreatment |
| Note: Basis of Wastewater Quantity = 80% of Water Supply Utilization | |
| 3 |
Solid Waste Disposal
| - |
Collection system by solid waste truck (daily collection) |
| - |
Incinerators plant with installation of air pollution control equipment |
| - |
Sanitary landfill for residue (ash) and non-combustible solid disposal | |
3.5 Baht / Kg. |
| 4 |
General Service & Maintenance
| - |
Repairing of storm drainage structure |
| - |
Removal of sediment |
| - |
Repairing of land erosion |
| - |
Street cleaning |
| - |
Street lighting |
| - |
Weed cutting |
| - |
safety guard |
| - |
Coordination service with TOT,PEA etc. |
| - |
Others | |
700 baht / rai / month |
| 5 |
Telephone System
| - |
Telephone center building |
| - |
Transmission system |
| - |
Switching system |
| - |
Outside plant system | |
Same rates as per Telephone Organizaton of Thailand |
| 6 |
Satellite Communication
| - |
Intelsat Business Service ( IBS ) |
| - |
2 Mbit / Second |
| - |
Date, Voice, Video | |
Rental rate for each circuit as per the Communication Authority of Thailand (CAT) |